Pass Planner
Enter the floor size, what is on it, the finish you want and the crew you will have. See the ladder of grits, the passes and the days of work.

How Many Passes? Pass Planner
- Days of work-
- Grinding passes-
- Pace-
- Order of work-
Saved. It travels with the form at the bottom of this page.
A typical plan from common production rates, not a promise. Slab hardness, access, repairs and weather change it, and we confirm dates in the written plan.
What the numbers mean
- A ladder of gritsThe chart shows the coarse metal steps, the densifier and the fine resin steps in order.
- Days, not guessesThe tool turns floor area and machine count into a typical schedule.
- Prep countedCoatings, roughness and repairs add time, and the plan shows it.
About this tool
Is this a promise?
No. It is a typical plan from common production rates. We give exact dates with the written scope.
Why do more machines not halve the time?
Edges, prep, repairs and cleanup do not speed up in the same way as the open floor.
What do the grit numbers mean?
Lower numbers are coarse and remove material, higher numbers are fine and create the shine.
When the plan says it is time
PrepConcrete GrindingConcrete grinding with diamond tooling that levels, cleans and opens the slab, the first and most important step of every polished floor.See the service
PrepDust-Free Grinding and ContainmentDust-free grinding with industrial extractors and containment barriers that protect stock, equipment, offices and homes from fine concrete dust.See the service
IndustrialWarehouse Floor PolishingWarehouse floor polishing that hardens and brightens a big slab, cuts dust and tire wear and makes lanes, racks and labels easier to see.See the service Ready to see your floor shine?
Call or text Concrete Polisher, or send the form, and tell us about the floor. We reply with clear next steps and a plan that fits the slab.